Friday, September 25, 2015

Finishes inside and out


The yard makeover is almost finished! Just a little sand and grass here and there then we can enjoy our new outside spaces.


The wedding gift is finished! Now I can work on the baby quilts.


The apron is reversible.


Baby quilt top #1 is done.


Baby quilt top #2 is done.


I have a plush yellow for both backs and navy dot for binding.


Not a big hurry since the twins are not due until February. I just wanted to see how the fabrics looked in different combinations.

WIP calling-Christmas Scrappy Gretchen.
Linking with Crazy Mom.


Saturday, September 19, 2015

wedding gift part 1

In my last post I wrote that I had to work on a wedding gift for an upcoming wedding. Bet you thought I was making a quilt. No, I don't have that much time. (I do teach full-time.)
I am giving them a set of handmade kitchen items. 


First finished is this reversible apron.


I am using four of the Art Gallery fabrics I won from Fab Shop Hop.


Today I hope to finish two potholders, an oven mitt, and two tea towels.

Last weekend two of my quilts were in the quilt celebration. You may ask why my quilt is hanging side-ways. That would be because I sewed the hanging sleeve on the long side. I didn't realize it was wrong until I took it to the show. When I got the quilt back home I saw that I had sewn the label on sideways, too. Typical. Oh, my!



Sunday, September 13, 2015

Two rows

This week end was the Jackson Quilt Celebration so I didn't have any time to sew. Labor Day week end I cut out two rows from my Row by Row patterns. I finished them in the evenings after school.


The top row is from The Fabric Dock in Wiggins. I love the sailboat block. It was very easy to make.
The bottom row is from Sew Memphis. The zigzag middle part is made of half square triangles. The back of that section is a hot mess but the front looks okay. 

I have patterns for 8 more rows but I think I will only make 6 more to have the required 8 rows. The rows above are the only ones that do not have the dreaded 'appliqué' as part of the design.

I now have a list of WIPs again. Christmas Scrappy Gretchen is in progress. Row by row is in progress. And I have chosen fabric to make a wedding gift for a wedding in October. Oh, yes, and two baby quilts for twins due in February.

Which one do I want to work on? The baby quilts, of course. 

Must make wedding gift first! Keep telling myself. Wedding gift...

Sunday, August 30, 2015

Hot Fingers Finished

I finished twenty-nine pairs of 'Hot Fingers' and gave them to the board members at Saturday's meeting. Glad to be finished. In some ways a bigger project than making a quilt. 


Bag stuffed full 


Spilling out


Still lots inside


29 sets - That is 58 individual hot fingers!


Pincushion made from scraps -side 1


pincushion side 2

Glad this project is finished. Now I can work on my Row by Row quilt and Scrappy Gretchen Christmas quilt. The Jackson Quilt Celebration is in two weeks. 

Happy Sewing!

Saturday, August 1, 2015

A little traveling, sewing, and bird watching

So, there's this shop hop thing going on, and I'm hooked. The day it opened here I went to the 3 nearest participating stores and picked up the patterns and fabric car tags but thought I would use my own fabric scraps to make the rows.

Then I went to a convention in St. Louis, MO, and checked out 3 stores close to my hotel. I bought one kit, picked up the free patterns, and bought the tags. So that left 2 more store visits to have the minimum rows to make a lap quilt. 
A little road trip was necessary to get the final 2 rows. My choices were a 3 hour drive to Memphis or a 2 hour drive to Wiggins and Hattiesburg. I opted for the shorter drive. The last two rows were so cute that I bought the kits. Now to put the rows together. 
The nearest QS has not had a winner but my sewing time/summer break is about gone. Don't know if I will finish before someone else turns in their quilt. We'll see how this row thing turns out. More on that later.

Here are some of my row by row patterns and tags.


Meanwhile, progress has been made on the gifts for reading board members. Please forgive the horrible phone photos.


Seventeen sets have been sewn and turned right side out. Twelve more sets have been cut out. They are quick to make but turning kills my fingers. Hope to finish before going back to work Wednesday.


My new sewing machine is set up on the dining table where I have a great view of the bird baths.


I love watching the tufted titmouse come for a drink.


Here is the hibiscus finally blooming by the front door.



Hope you have a great week end. Time to sew!


Friday, July 24, 2015

Matching pillow cover

Here is the matching pillow cover for Liam's quilt.
I love the little fox fabric in the middle of the checkerboard squares.



The back is made from the left over bits.


After lots of thinking and figuring I decided to put the opening for inserting the pillow on the end.


I went with kid friendly velcro instead of a zipper or buttons.


  Had to share this shrimp plant by our front door.


These are wheelchair bags our quilt group has been asked to make for a rehab center. The handles will be added by someone else. They were quick and easy to make.


More plant pics - these are on the other side of our front door.


These have looked great all summer. They get lots of heat and morning sun.


Well, that's it for me this week. Only one week and two days of summer left for me.
How's your summer sewing? (or winter if you are down under)


Friday, July 10, 2015

Yipee! It's finished.

It's 102 degrees in middle Mississippi today, so celebrating a quilt finish seems kind of funny. 
We won't need quilts for many months unless we turn the air conditioning down. But I'm excited about this finish. The pattern is from the book Fat Quarter Fun. Here are the finish photos.



I was going for a random placement of the 13 different fabrics. I can see one oops!


Even got the label on it.


No quilt holder available but the fence was handy.




Finished today: Liam's Whirly World, 68" X 89". 

Hope you have an exciting finish this week.